{"id":75398,"date":"2018-10-09T15:45:13","date_gmt":"2018-10-09T13:45:13","guid":{"rendered":"https:\/\/blejkan.pl\/realizacje\/trenchless-rehabilitation-of-sewers-in-gdansk\/"},"modified":"2022-09-30T13:52:39","modified_gmt":"2022-09-30T11:52:39","slug":"trenchless-rehabilitation-of-sewers-in-gdansk","status":"publish","type":"portfolio","link":"https:\/\/www.blejkan.ro\/en\/proiecte\/trenchless-rehabilitation-of-sewers-in-gdansk\/","title":{"rendered":"Trenchless rehabilitation of sewers in Gda\u0144sk"},"content":{"rendered":"","protected":false},"excerpt":{"rendered":"<p>Rehabilitation of a ca. 3.2 km long sewer and 100 manholes, 130 laterals, and 10 sewer connections in Gda\u0144sk \u2013 an agreement for this project was signed in June 2017 with Gda\u0144ska Infrastruktura Wodoci\u0105gowo-Kanalizacyjna sp. z o.o. The diameters of rehabilitated sewers: DN200\u2013DN450. To carry out the rehabilitation we chose the CIPP trenchless method using a fiber-glass reinforced lining, UV light cured (ca. 2.5 km sewer), while ducts were replaced by pipe bursting (ca. 300 m) and open trench (ca. 400 m). This investment is worth over PLN 3.5 million net. The planned completion date is 14 July 2019, however, due to good work progress we plan to finish the contract still in 2018.<\/p>\n<p>Date: 2017-2018<br \/>\nInvestor: Gda\u0144ska Infrastruktura Wodoci\u0105gowo-Kanalizacyjna sp. z o.o.<br \/>\nTechnology: CIPP<\/p>\n","protected":false},"author":1,"featured_media":74166,"parent":0,"menu_order":0,"comment_status":"open","ping_status":"open","template":"","meta":{"footnotes":""},"portfolio_category":[165],"class_list":["post-75398","portfolio","type-portfolio","status-publish","has-post-thumbnail","hentry","portfolio_category-cipp-en"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO 5.0.1.1 - aioseo.com -->\n\t<meta name=\"description\" content=\"Rehabilitation of a ca. 3.2 km long sewer and 100 manholes, 130 laterals, and 10 sewer connections in Gda\u0144sk \u2013 an agreement for this project was signed in June 2017 with Gda\u0144ska Infrastruktura Wodoci\u0105gowo-Kanalizacyjna sp. z o.o. The diameters of rehabilitated sewers: DN200\u2013DN450. To carry out the rehabilitation we chose the CIPP trenchless method using a fiber-glass reinforced lining, UV light cured (ca. 2.5 km sewer), while ducts were replaced by pipe bursting (ca. 300 m) and open trench (ca. 400 m). This investment is worth over PLN 3.5 million net. The planned completion date is 14 July 2019, however, due to good work progress we plan to finish the contract still in 2018. Date: 2017-2018 Investor: Gda\u0144ska Infrastruktura Wodoci\u0105gowo-Kanalizacyjna sp. z o.o. Technology: CIPP\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"blejkan\"\/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.blejkan.ro\/en\/proiecte\/trenchless-rehabilitation-of-sewers-in-gdansk\/\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO (AIOSEO) 5.0.1.1\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.blejkan.ro\\\/en\\\/proiecte\\\/trenchless-rehabilitation-of-sewers-in-gdansk\\\/#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.blejkan.ro\\\/en\\\/#listItem\",\"position\":1,\"name\":\"Prima pagin\\u0103\",\"item\":\"https:\\\/\\\/www.blejkan.ro\\\/en\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.blejkan.ro\\\/en\\\/proiecte\\\/#listItem\",\"name\":\"Proiecte\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.blejkan.ro\\\/en\\\/proiecte\\\/#listItem\",\"position\":2,\"name\":\"Proiecte\",\"item\":\"https:\\\/\\\/www.blejkan.ro\\\/en\\\/proiecte\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.blejkan.ro\\\/en\\\/proiecte_cat\\\/cipp-en\\\/#listItem\",\"name\":\"CIPP\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.blejkan.ro\\\/en\\\/#listItem\",\"name\":\"Prima pagin\\u0103\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.blejkan.ro\\\/en\\\/proiecte_cat\\\/cipp-en\\\/#listItem\",\"position\":3,\"name\":\"CIPP\",\"item\":\"https:\\\/\\\/www.blejkan.ro\\\/en\\\/proiecte_cat\\\/cipp-en\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.blejkan.ro\\\/en\\\/proiecte\\\/trenchless-rehabilitation-of-sewers-in-gdansk\\\/#listItem\",\"name\":\"Trenchless rehabilitation of sewers in Gda\\u0144sk\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.blejkan.ro\\\/en\\\/proiecte\\\/#listItem\",\"name\":\"Proiecte\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.blejkan.ro\\\/en\\\/proiecte\\\/trenchless-rehabilitation-of-sewers-in-gdansk\\\/#listItem\",\"position\":4,\"name\":\"Trenchless rehabilitation of sewers in Gda\\u0144sk\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.blejkan.ro\\\/en\\\/proiecte_cat\\\/cipp-en\\\/#listItem\",\"name\":\"CIPP\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.blejkan.ro\\\/en\\\/#organization\",\"name\":\"BLEJKAN Construct SRL - Renovare f\\u0103r\\u0103 canale de canale \\u0219i re\\u021bele\",\"description\":\"Modernizarea cablurilor de re\\u021bea Un lider \\u00een industria renov\\u0103rii\",\"url\":\"https:\\\/\\\/www.blejkan.ro\\\/en\\\/\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.blejkan.ro\\\/en\\\/author\\\/blejkan\\\/#author\",\"url\":\"https:\\\/\\\/www.blejkan.ro\\\/en\\\/author\\\/blejkan\\\/\",\"name\":\"blejkan\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/www.blejkan.ro\\\/en\\\/proiecte\\\/trenchless-rehabilitation-of-sewers-in-gdansk\\\/#authorImage\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/3a0c6dcb3ed11d3f372832025967feedbfe1ab67098ba43f919c9999018cd289?s=96&d=mm&r=g\",\"width\":96,\"height\":96,\"caption\":\"blejkan\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.blejkan.ro\\\/en\\\/proiecte\\\/trenchless-rehabilitation-of-sewers-in-gdansk\\\/#webpage\",\"url\":\"https:\\\/\\\/www.blejkan.ro\\\/en\\\/proiecte\\\/trenchless-rehabilitation-of-sewers-in-gdansk\\\/\",\"name\":\"Trenchless rehabilitation of sewers in Gda\\u0144sk | BLEJKAN Construct SRL\",\"description\":\"Rehabilitation of a ca. 3.2 km long sewer and 100 manholes, 130 laterals, and 10 sewer connections in Gda\\u0144sk \\u2013 an agreement for this project was signed in June 2017 with Gda\\u0144ska Infrastruktura Wodoci\\u0105gowo-Kanalizacyjna sp. z o.o. The diameters of rehabilitated sewers: DN200\\u2013DN450. To carry out the rehabilitation we chose the CIPP trenchless method using a fiber-glass reinforced lining, UV light cured (ca. 2.5 km sewer), while ducts were replaced by pipe bursting (ca. 300 m) and open trench (ca. 400 m). This investment is worth over PLN 3.5 million net. The planned completion date is 14 July 2019, however, due to good work progress we plan to finish the contract still in 2018. Date: 2017-2018 Investor: Gda\\u0144ska Infrastruktura Wodoci\\u0105gowo-Kanalizacyjna sp. z o.o. Technology: CIPP\",\"inLanguage\":\"en-US\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.blejkan.ro\\\/en\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.blejkan.ro\\\/en\\\/proiecte\\\/trenchless-rehabilitation-of-sewers-in-gdansk\\\/#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.blejkan.ro\\\/en\\\/author\\\/blejkan\\\/#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.blejkan.ro\\\/en\\\/author\\\/blejkan\\\/#author\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.blejkan.ro\\\/wp-content\\\/uploads\\\/2018\\\/10\\\/MG_3376.jpg\",\"@id\":\"https:\\\/\\\/www.blejkan.ro\\\/en\\\/proiecte\\\/trenchless-rehabilitation-of-sewers-in-gdansk\\\/#mainImage\",\"width\":1600,\"height\":1067},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.blejkan.ro\\\/en\\\/proiecte\\\/trenchless-rehabilitation-of-sewers-in-gdansk\\\/#mainImage\"},\"datePublished\":\"2018-10-09T15:45:13+02:00\",\"dateModified\":\"2022-09-30T13:52:39+02:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.blejkan.ro\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.blejkan.ro\\\/en\\\/\",\"name\":\"BLEJKAN Construct SRL - Renovare f\\u0103r\\u0103 canale de canale \\u0219i re\\u021bele\",\"description\":\"Modernizarea cablurilor de re\\u021bea Un lider \\u00een industria renov\\u0103rii\",\"inLanguage\":\"en-US\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.blejkan.ro\\\/en\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO -->\n\n","aioseo_head_json":{"title":"Trenchless rehabilitation of sewers in Gda\u0144sk | BLEJKAN Construct SRL","description":"Rehabilitation of a ca. 3.2 km long sewer and 100 manholes, 130 laterals, and 10 sewer connections in Gda\u0144sk \u2013 an agreement for this project was signed in June 2017 with Gda\u0144ska Infrastruktura Wodoci\u0105gowo-Kanalizacyjna sp. z o.o. The diameters of rehabilitated sewers: DN200\u2013DN450. To carry out the rehabilitation we chose the CIPP trenchless method using a fiber-glass reinforced lining, UV light cured (ca. 2.5 km sewer), while ducts were replaced by pipe bursting (ca. 300 m) and open trench (ca. 400 m). This investment is worth over PLN 3.5 million net. The planned completion date is 14 July 2019, however, due to good work progress we plan to finish the contract still in 2018. Date: 2017-2018 Investor: Gda\u0144ska Infrastruktura Wodoci\u0105gowo-Kanalizacyjna sp. z o.o. Technology: CIPP","canonical_url":"https:\/\/www.blejkan.ro\/en\/proiecte\/trenchless-rehabilitation-of-sewers-in-gdansk\/","robots":"max-image-preview:large","keywords":"","webmasterTools":{"miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BreadcrumbList","@id":"https:\/\/www.blejkan.ro\/en\/proiecte\/trenchless-rehabilitation-of-sewers-in-gdansk\/#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.blejkan.ro\/en\/#listItem","position":1,"name":"Prima pagin\u0103","item":"https:\/\/www.blejkan.ro\/en\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.blejkan.ro\/en\/proiecte\/#listItem","name":"Proiecte"}},{"@type":"ListItem","@id":"https:\/\/www.blejkan.ro\/en\/proiecte\/#listItem","position":2,"name":"Proiecte","item":"https:\/\/www.blejkan.ro\/en\/proiecte\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.blejkan.ro\/en\/proiecte_cat\/cipp-en\/#listItem","name":"CIPP"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.blejkan.ro\/en\/#listItem","name":"Prima pagin\u0103"}},{"@type":"ListItem","@id":"https:\/\/www.blejkan.ro\/en\/proiecte_cat\/cipp-en\/#listItem","position":3,"name":"CIPP","item":"https:\/\/www.blejkan.ro\/en\/proiecte_cat\/cipp-en\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.blejkan.ro\/en\/proiecte\/trenchless-rehabilitation-of-sewers-in-gdansk\/#listItem","name":"Trenchless rehabilitation of sewers in Gda\u0144sk"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.blejkan.ro\/en\/proiecte\/#listItem","name":"Proiecte"}},{"@type":"ListItem","@id":"https:\/\/www.blejkan.ro\/en\/proiecte\/trenchless-rehabilitation-of-sewers-in-gdansk\/#listItem","position":4,"name":"Trenchless rehabilitation of sewers in Gda\u0144sk","previousItem":{"@type":"ListItem","@id":"https:\/\/www.blejkan.ro\/en\/proiecte_cat\/cipp-en\/#listItem","name":"CIPP"}}]},{"@type":"Organization","@id":"https:\/\/www.blejkan.ro\/en\/#organization","name":"BLEJKAN Construct SRL - Renovare f\u0103r\u0103 canale de canale \u0219i re\u021bele","description":"Modernizarea cablurilor de re\u021bea Un lider \u00een industria renov\u0103rii","url":"https:\/\/www.blejkan.ro\/en\/"},{"@type":"Person","@id":"https:\/\/www.blejkan.ro\/en\/author\/blejkan\/#author","url":"https:\/\/www.blejkan.ro\/en\/author\/blejkan\/","name":"blejkan","image":{"@type":"ImageObject","@id":"https:\/\/www.blejkan.ro\/en\/proiecte\/trenchless-rehabilitation-of-sewers-in-gdansk\/#authorImage","url":"https:\/\/secure.gravatar.com\/avatar\/3a0c6dcb3ed11d3f372832025967feedbfe1ab67098ba43f919c9999018cd289?s=96&d=mm&r=g","width":96,"height":96,"caption":"blejkan"}},{"@type":"WebPage","@id":"https:\/\/www.blejkan.ro\/en\/proiecte\/trenchless-rehabilitation-of-sewers-in-gdansk\/#webpage","url":"https:\/\/www.blejkan.ro\/en\/proiecte\/trenchless-rehabilitation-of-sewers-in-gdansk\/","name":"Trenchless rehabilitation of sewers in Gda\u0144sk | BLEJKAN Construct SRL","description":"Rehabilitation of a ca. 3.2 km long sewer and 100 manholes, 130 laterals, and 10 sewer connections in Gda\u0144sk \u2013 an agreement for this project was signed in June 2017 with Gda\u0144ska Infrastruktura Wodoci\u0105gowo-Kanalizacyjna sp. z o.o. The diameters of rehabilitated sewers: DN200\u2013DN450. To carry out the rehabilitation we chose the CIPP trenchless method using a fiber-glass reinforced lining, UV light cured (ca. 2.5 km sewer), while ducts were replaced by pipe bursting (ca. 300 m) and open trench (ca. 400 m). This investment is worth over PLN 3.5 million net. The planned completion date is 14 July 2019, however, due to good work progress we plan to finish the contract still in 2018. Date: 2017-2018 Investor: Gda\u0144ska Infrastruktura Wodoci\u0105gowo-Kanalizacyjna sp. z o.o. Technology: CIPP","inLanguage":"en-US","isPartOf":{"@id":"https:\/\/www.blejkan.ro\/en\/#website"},"breadcrumb":{"@id":"https:\/\/www.blejkan.ro\/en\/proiecte\/trenchless-rehabilitation-of-sewers-in-gdansk\/#breadcrumblist"},"author":{"@id":"https:\/\/www.blejkan.ro\/en\/author\/blejkan\/#author"},"creator":{"@id":"https:\/\/www.blejkan.ro\/en\/author\/blejkan\/#author"},"image":{"@type":"ImageObject","url":"https:\/\/www.blejkan.ro\/wp-content\/uploads\/2018\/10\/MG_3376.jpg","@id":"https:\/\/www.blejkan.ro\/en\/proiecte\/trenchless-rehabilitation-of-sewers-in-gdansk\/#mainImage","width":1600,"height":1067},"primaryImageOfPage":{"@id":"https:\/\/www.blejkan.ro\/en\/proiecte\/trenchless-rehabilitation-of-sewers-in-gdansk\/#mainImage"},"datePublished":"2018-10-09T15:45:13+02:00","dateModified":"2022-09-30T13:52:39+02:00"},{"@type":"WebSite","@id":"https:\/\/www.blejkan.ro\/en\/#website","url":"https:\/\/www.blejkan.ro\/en\/","name":"BLEJKAN Construct SRL - Renovare f\u0103r\u0103 canale de canale \u0219i re\u021bele","description":"Modernizarea cablurilor de re\u021bea Un lider \u00een industria renov\u0103rii","inLanguage":"en-US","publisher":{"@id":"https:\/\/www.blejkan.ro\/en\/#organization"}}]}},"aioseo_meta_data":{"post_id":"75398","title":null,"description":null,"keywords":null,"keyphrases":null,"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":null,"og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"WebPage","isEnabled":true},"graphs":[]},"schema_type":null,"schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":null,"robots_max_videopreview":null,"robots_max_imagepreview":"large","priority":null,"frequency":null,"local_seo":null,"breadcrumb_settings":null,"limit_modified_date":false,"ai":null,"created":"2021-01-22 09:40:54","updated":"2022-11-18 21:46:03","focus_keyword":null,"additional_keywords":null,"truseo_locale":null,"seo_analyzer_scan_date":null},"_links":{"self":[{"href":"https:\/\/www.blejkan.ro\/en\/wp-json\/wp\/v2\/portfolio\/75398","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.blejkan.ro\/en\/wp-json\/wp\/v2\/portfolio"}],"about":[{"href":"https:\/\/www.blejkan.ro\/en\/wp-json\/wp\/v2\/types\/portfolio"}],"author":[{"embeddable":true,"href":"https:\/\/www.blejkan.ro\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.blejkan.ro\/en\/wp-json\/wp\/v2\/comments?post=75398"}],"version-history":[{"count":0,"href":"https:\/\/www.blejkan.ro\/en\/wp-json\/wp\/v2\/portfolio\/75398\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.blejkan.ro\/en\/wp-json\/wp\/v2\/media\/74166"}],"wp:attachment":[{"href":"https:\/\/www.blejkan.ro\/en\/wp-json\/wp\/v2\/media?parent=75398"}],"wp:term":[{"taxonomy":"portfolio_category","embeddable":true,"href":"https:\/\/www.blejkan.ro\/en\/wp-json\/wp\/v2\/portfolio_category?post=75398"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}